Project: Tyndrum, Letham, Plean, Philipshill, Langholm, Knust, Dunlop, Hartshill, Kilearn WwTWs Year: 2002 Client: Scottish Water Country: UK (Scotland) Value: ?1,300,000.00 (Turnkey) in 2002 - (total for all nine schemes) Description: Naston has carried out a Process Audit of the above nine Scottish Water's Minor Waste Water Treatment Works to establish the scope of work required to improve operation, and to obtain consent compliance. The work includes process analysis, design, supply, installation and commissioning of the work while ensuring continuous operation. The scope of supply includes additional air blowers, sewage/sludge pumps, filter media, Naston SAF units, inlet screens, mixers, aerators, plus all valves, piping, instrumentation and controls.
Project: Edenbridge WwTW Phase 2 Year: 2001 Client: Southern Water Services Country: UK Value: ?466,000.00 (Turnkey) in 2001 Description: Turnkey design, supply, installation and commissioning of inlet works, with new 6 mm fine screens, conveyors, screenings handling, grit handling and skip trolley systems. Conversion of fixed primary tanks to rotating half bridge scraper tanks with civils modifications and tank coating, new site washwater system and all associated cables, instruments, panels and PLC/SCADA interfacing.
Project: Lagos State Water Supply Year: 2001 Client: NEN Ltd Country: Nigeria Value: ?400,000.00 (M & E) in 2001 Description: Design and supply of 4 No. 190 M3/hr Compak containerised water treatment plants.
Project: Portbury Wharf STW Extensions Year: 2001 Client: Wessex Water Services Country: UK Value: ?650,000.00 (M & E) in 2001 Description: Design, supply, installation and commissioning of conversion of existing SBR plant to activated sludge plant with additional aeration, RAS/SAS and scum pumping and new final settlement tanks, together with new MCC, modifications to existing MCC, cabling, instrumentation and PLC/SCADA interfacing.
Project: Waddan & Sukna Year: 2001 Client: Libyan Government Country: Libya Value: ?6,313,000.00 Description: Design, supply and commissioning of mechanical, electrical and ICA equipment for two oxidation ditch extended aeration sewage treatment plants at Waddan & Sukna in the Al Jufra region. Scope includes civil design, site supervision of erection and first years plant operation.
Project: Bridgwater Sewage Treatment Plant Year: 2000 Client: Wessex Water Services Country: UK Value: ?1,100,000.00 (M & E) in 2000 Description: This was a two phase project. The first phase included design, supply, installation and commissioning of new mechanical screens rated at 360 litres/sec, and screening handling equipment, complete with fully automatic 1250 kVA standby generator with all controls and switchgear. This generator also supplies surplus power into the local grid. The scope also includes replacement of 3 sets of sludge pumps and addition of separate pump package. The second phase was for a 'Fast Track Project' including design, supply, installation and commissioning of a sludge thickening plant, odour control, sludge belt press, polymer dosing and all electrics, controls and instrumentation, plus additional sludge pumps and booster pumps.
Project: Caroni Water Treatment Plant Upgrade Year: 2000 Client: Trinidad & Tobago Water Services Ltd (Penspen Ltd) Country: Trinidad Value: ?2,750,000.00 (M & E) in 1999 Description: Design (including conceptual process and hydraulic design), supply and installation of a new 3200 M3/hr treatment stream comprising raw water pumping, clarification, filtration and high lift pumping. New
Project: Eden Vale Sewage Treatment Plant Year: 2000 Client: Southern Water Services (C J Thorne & Co Ltd) Country: UK Value: ?460,000.00 (M & E) in 2000 Description: Design, supply, installation and commissioning of new inlet works to treat 229 litres/sec, storm tanks and sludge handling at Eden Vale. The scope includes new screens, grit and grease removal, sludge thickener, chemical dosing, complete with all switchgear controls and instrumentation.
Project: Fillyside Sewage Pumping Station Year: 2000 Client: East of Scotland Water (Alfred McAlpine) Country: UK Value: ?1,000,000.00 (M & E) in 2000 Description: Design, supply, installation and commissioning of new storm screening to treat 1000 litres/sec, replacement DWF pumps, replacement storm pumps, penstocks, standby generator, including motor control centre, PLC and SCADA. The system provides new screening facilities on the combined storm overflow at Fillyside to protect the water quality and amenities at Portobello beach and to meet legislation agreed with SEPA, and implement ESW 'Watermark Initiative'.
Project: Infrastructure Development Project Year: 2000 Client: Libyan Government Country: Libya Value: ?157,000.00 (M & E) in 2000 Description: Design and supply of potable water distribution system including piping, valves, fittings and metering systems.
|