Project: Wolfhill & Inversnaid WwTW Year: 2003 Client: Scottish Water- Country: UK (Scotland) Value: ?310,000.00 Description: Design, supply, installation and commissioning of two 1.5 l/s (500 pe) Immersed Membrane Bioreactor (IMBR) process package plants, including all associated M & E and civil works. Both plants are automatic and incorporate telemetry for remote monitoring of operation to limit supervision to the minimum.
Project: Balmaha WwTW Year: 2002 Client: East of Scotland Water Country: UK (Scotland) Value: ?210,000.00 (Turnkey) in 2002 Description: Initial process consultancy and costed report to achieve consent compliance on a site with large fluctuating tourist population. The scope included design, supply, installation and commissioning of new inlet screen and two Sequence Batch Reactors (SBR) with all electrics and controls.
Project: Bugthorpe WwTW Year: 2002 Client: Yorkshire Water (Costain Haswell) Country: UK Value: ?98,000.00 (M & E) in 2002 Description: Design, supply, installation, commissioning and training for a NS2 SAF unit for a population of 200 in a stainless steel tank complete with blowers and controls, plus a 22 M3 primary tank.
Project: Dalgety WwTW Year: 2002 Client: East of Scotland Water Country: UK (Scotland) Value: ?61,000.00 (Turnkey) in 2002 Description: Initial process consultancy with costed report to achieve consent compliance. The scope included inlet screen, chemical dosing, balancing of flows and general refurbishment.
Project: Drymen WwTW Year: 2002 Client: East of Scotland Water Country: UK (Scotland) Value: ?36,000.00 (Turnkey) in 2002 Description: Initial process consultancy with costed report to achieve discharge consent. The scope included design, supply, installation and commissioning of new humus tank, launders and scum removal system.
Project: Fallin WwTW Year: 2002 Client: East of Scotland Water Country: UK (Scotland) Value: ?157,000.00 (Turnkey) in 2002 Description: Initial process consultancy with costed report to achieve consent compliance. The scope of work includes two inlet screens and auto desludging with general modifications and refurbishment.
Project: Fintry WwTW Year: 2002 Client: East of Scotland Water Country: UK (Scotland) Value: ?200,000.00 (Turnkey) in 2002 Description: Initial process consultancy and costed report to achieve consent compliance with a fluctuating population. Scope of work included design, supply, installation and commissioning of new inlet screen, biological aerated filter (BAF) package plant and auto desludging system.
Project: Gairloch WwTW Year: 2002 Client: North of Scotland Water Authority (CCG) Country: UK (Scotland) Value: ?468,000.00 (M & E) in 2002 Description: Design, supply, installation and commissioning of all mechanical, electrical and ICA works for a membrane bioreactor sewage treatment plant, serving a population of 2122 in Western Scotland. Naston scope includes inlet works, sludge treatment, all membrane pipework, aeration equipment and chemical cleaning system. A bespoke MCC and PLC system provides process control and automation.
Project: Guma Valley Pumps Year: 2002 Client: Guma Valley Water Company Country: Sierra Leone Value: ?60,000.00 (Design and Supply) in 2002 Description: Two x 42 l/s @ 117 m head water pumpsets and two x 75 l/s @ 100 m head water pumpsets complete with panels and spares.
Project: Herbrandston WwTW Year: 2002 Client: Welsh Water (MEICA Process) Country: UK (Wales) Value: ?88,000.00 (M & E) in 2002 Description: Design, supply, installation and commissioning of NS3 SAF unit combined with a NS5 clarifier unit, including blowers, desludge pumps, panel and kiosk.
|