Project: South Staffordshire Water Framework
Year: 2005
Client: South Staffordshire Water
Country: UK
Value: ?9,500,000.00 (2005 to 2009)
Description: Five year framework for South Staffordshire Water's AMP 4 programme for their total water supply. This includes feasibility study, evaluation, and costing of each works order making up their AMP 4 investment programme. Following approval, the scope of work includes detailed design for mechanical, electrical and civil works, supply, installation, commissioning, testing and training of operations staff, plus support during operation.


Project: Stoer WTW
Year: 2005
Client: Scottish Water Solutions (Tulloch)
Country: Scotland
Value: ?300,000.00
Description: Process, mechanical and electrical design, supply, installation and commissioning of Sand, GAC and Limestone filtration system for raw water supply. Includes automatic pressure filters with battery backup and UPS system.


Project: Ullapool WwTW
Year: 2005
Client: Scottish Water Solutions (Tulloch)
Country: Scotland
Value: ?925,230.00
Description: Process, mechanical and electrical design and supply for a primary treatment works including package screen, grit trap and classifier, two primary settlement tanks with associated scum pumping. Sludge treatment comprising reception screen, pump station, PFT, sludge holding tank and centrifuge thickening with odour control. Including MCC and all controls.


Project: Wool STW Extension
Year: 2005
Client: Morgan Est (Wessex Water)
Country: UK
Value: ?600,000
Description: Design, supply, installation, testing and commissioning of the Process and Mechanical and Electrical Works with civil works being implemented by Morgan Est. The extension and refurbishment works increases the plant throughput from 120 l/s to 174 l/s and includes inlet screens, handling equipment, grit plant, aeration equipment with mixers and blowers, final settlement bridge scraper and ferric dosing. The sludge is thickened in a centrifugal drum thickener and Sludge thickening tank with polymer dosing. The electrical supply includes all MCCs with PLC control and standby generator.


Project: Axbridge WTW
Year: 2004
Client: Bristol Water
Country: UK
Value: ?353,000.00
Description: A fast track contract to provide additional clean water supply to the adjacent storage reservoir to satisfy local demand problems. The contract consists of the design, supply and installation of two steel settlement tanks of 1000 M3 capacity, transfer pumps, chemical storage and dosing and large bore D.I. piping and valves. The construction time from a greenfield site to pumping water was completed in 8 weeks to be ready for the seasonal requirement


Project: Baghdad & Basra STP's
Year: 2004
Client: British Embassies
Country: Iraq
Value: ?260,000.00
Description: Design and supply of two Constant Transfer package sewage treatment plants, each designed to suit a population of 300 persons (54 M3 per day) to give an effluent standard of BOD5 - 10 mg/l and suspended solids - 10 mg/l.


Project: Braystones WwTW
Year: 2004
Client: United Utilities
Country: UK
Value: ?81,000.00
Description: Provision of a submerged aeration system comprising of 2 x sets of 3 removable diffuser grids, complete with all stainless steel piping, instruments, flow control valves and blower sets for sewage treatment plant.


Project: Carron Valley, Blairingone, Shieldhall, Burntisland PS, Corsehouse
Year: 2004
Client: Scottish Water
Country: UK (Scotland)
Value: ?408,000.00
Description: Resolving the process and M/E requirements on the projects in a continuation of Naston's Minor Waste Water Works framework with Scottish Water. Naston carried out a process audit on each scheme to produce a fully detailed costed target price. The work includes process analysis, design, supply, installation and commissioning of the works while maintaining operation of the existing schemes. The scope of supply includes supply of pumps, blowers, inlet screens, tanks, valves and piping instrumentation, electrics, controls and civil works.


Project: Cupar WwTW
Year: 2004
Client: Scottish Water
Country: UK (Scotland)
Value: ?426,000.00
Description: Design, installation and commissioning of 3 x 15 l/s sludge press screens to treat imported sludge, complete with sludge screen feed pumps and site odour control facilities, including all controls and instrumentation.


Project: Edenbridge WwTW
Year: 2004
Client: Southern Water
Country: UK
Value: ?33,000.00
Description: Provision of a storm return flow regulation valve, complete with associated PLC modifications and electrics modifications to an existing grit classifier installation and skip rail system


Pages: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16

| Top |

 
Projects Reference
Project Reference List
Powder Process Division
Package Plant Division

Quick Search
 Go